COMMUNICATION AND INFORMATION SYSTEMS DEPOT, KANDAHAR AIRFIELD (KAF), AFGHANISTAN

Project Name and Location  : Communication and Information Systems
Depot, KAF, Afghanistan

Owner  : NAMSA

Estimated Construction Cost  : 2,101,896.-€ (R/C) - 2,313,971.-€ (Steel)

A/E services include preparation of architectural, civil/structural, mechanical (HVAC and sanitary), electrical (LV, telephone/data/PA) and fire protection designs.

CIS Depot is designed in two alternatives. Alternative 1 is a pre-engineered steel structure and Alternative 2 covers a reinforced concrete structure. Both alternatives call for a single floor, unhardened structure approximately 1000 m2 in usable area. Project scope also includes an exterior hardstand (3,486 m2) for the storage of materials.

 

Design Experience Sheets

(Please Contact GEMAS for Details of Projects)

1

CIS Depot

CIS Depot