BAGRAM AB, CONSTRUCTION OF PARALLEL TAXIWAY, AFGHANISTAN (DESIGN/BUILD)


Project Name and Location  : Construction of Parallel Taxiway and Ramps, Bagram Airbase, Afghanistan

Owner  : SERKA INC./KBR INC.

Construction Cost  : 23,619,724.-$


A/E services include preparation of pavement and electrical designs. Scope covers Parallel Taxiway, Connection Taxitracks, Hot Cargo Pad, Taxiway/Taxitrack Lighting and Cargo Pad Floodlighting. Project scope also covers evaluation and modification of the existing lighting systems and surface and subsurface drainage systems for the new taxiway and taxitracks.

 

 

Design Experience Sheets

(Please Contact GEMAS for Details of Projects)

Hot Cargo Pad

Flood Lighting